Planning an ADU: design, permits, and professionals

Accessory dwelling units need clear goals, site reality checks, and the right mix of design and engineering — before you fall in love with a floor plan.

Start your projectBrowse professionals

An ADU can create rental income, multigenerational housing, or a flexible guest suite — but success depends on zoning, utilities, parking, and construction cost, not just a pretty plan.

Confirm the site can host an ADU

  • Zoning and local ADU ordinances (size, height, setbacks)
  • Utility capacity (water, sewer/septic, power)
  • Access and parking requirements
  • Tree, slope, and drainage constraints

Who you typically need

Most homeowners start with architectural design. Structural engineering is common for detached units or complex foundations. Civil input matters when grading, utilities, or stormwater are nontrivial.

Budget for more than the building

Utility connections, driveway work, landscaping restoration, and furniture often surprise owners. Keep contingency and soft costs in the plan from day one.

FAQ

Can I use a stock ADU plan?
Sometimes as a starting point — but site conditions, codes, and utility connections almost always require professional adaptation and stamped documents where required.
How long does ADU design take?
Simple projects can move in a few months of design and permitting; complex sites take longer. Timeline depends on jurisdiction review and consultant coordination.
Start your projectBrowse professionals

Related guides

Ready to take the next step?

Share a short project brief. We verify it and match you carefully — no spam, no obligation.

Start your project Browse professionals